There was some pumping on 2/23/12. Russ and Mike from Intrepid were very helpful showing Larry Volk around, and let him document the process. |

This is where the brine flows onto the flats from the manifold.
|

Water NOT going into the Saldaro Dyke.
|

This is the new fresh water pump Inrepid installed to pump water into pond 4 North. It will also be used next year to put water into both 4 South and North, for pumping.
|

This is 4 North. This pond will completely pump dry during the pumping.
|

Another view of 4 North.
|

This is the pump that feeds water to the manifold along I-80 and onto the flats.
|

This is the collection ditch from 4 North to the manifold pump.
|

Water flowing from the pump into the manifold on I-80.
|

Manifold along I-80.
|

The fresh water canal that feeds the pump into 4 North.
|
|